We know we had 30,000 gal. of water in the storage tanks on June 5 at night and the next morning, it was gone. Headquarters was out of water. No cold showers, in fact, no showers at a

So, we worked with the fine folks at the Berkeley campus in Physical Plant and we arranged a contract with Maggiora Bros. from Watsonville. On July 9 they started work (photos). This may take a while. Huge stones and boulders were found by the entry gate to the Lower Barn. But, that was all and the trenching has gone smoothly since they broke a chain on those rocks.
This will finally replace all the original Hastings pipes and we now have an accurate map of all the junctions, valves and pipes. We are doing this work with a desing to accomodate the future (hope!) funding that will allow us to start using the Arnold Spring again. This spring stopped in 1989 at the Loma Prieta earthquake. We switched entirely to the well, but the spring is back on. If we can refurbishg the other 2.1 miles of pipe, we could stop pumping. But for now, we have to fix the lines from the Hastings well to the Lower Barn.
<< Home